Guidance Notes
Step 1
Specify the dimensions of the main section.
If you have a particular space or object
that the building must clear then enter the
width/W/and height/H/of this. If not then
enter the internal span/S/for the building.
(Note that the maximum internal height of
the building will be approximately half its
internal span).
Step 2
Select the type of termination required
for end 1 and end 2 of the main section.
(Note that each clamshell end will increase
the overall length of the building by
approximately half its span).
Step 3
Select a colour for the building from our
standard range. If you require a different
colour or have a colour scheme in mind
then please provide details of this in the
additional requirements section.
If you have
a requirement for artwork to be applied to
the building then details of this can also be
submitted in the additional requirements
section.
Please note that non-standard
colours may be subject to a minimum order
quantity.
Step 4
Specifiy the anchoring system you require.
This will depend upon the type of surface on
which the building will be erected. Choose
spiral anchors for soft ground such as grass,
chemical anchors for hard surfaces such as
concrete that can be drilled/or ballast tanks
for surfaces that cannot be drilled.
Step 5
Specify any additional requirements. These
could include requirements for flooring,
lighting/heating/air conditioning etc. This
section can also be used to specify door
sizes and quantities and any specifications
for special colours or artwork.
Please feel
free to attach documents with details of
specifications or artwork. If multiple
buildings are required then please state the
quantity in this section.
Step 6
Provide your contact details |